New villa

Smart home for a villa under construction

The best time for a smart home is before the walls are closed. We work with your architect and electrician, so cables, panels and network are planned once and not redone later.

VAT excluded. The final price depends on the property and is fixed after a visit.

Sounds familiar?

Mistakes that cannot be undone

A missing cable or a panel that is too small shows up after plastering. We review the drawings while they can still change.

Wi-Fi that does not reach the garden

We plan the network for every floor and the outdoor area, with the equipment in proper cabinets.

Too many contractors

Lighting, climate, cameras and access come from different trades. We make them one system.

What we do

  • Review of electrical and low-voltage drawings
  • KNX or wireless automation, depending on the project
  • Network and Wi-Fi for all floors and outdoors
  • Perimeter cameras and access control
  • Outdoor lighting on sunset and time schedules
  • Home Assistant server: one app, no cloud dependency

How it works

  1. Drawings

    We go through the architect's and the electrician's plans.

  2. Specification

    Cable routes, panels, network cabinet and an equipment list with prices.

  3. Installation in stages

    Cabling during construction, devices at the finishing stage.

  4. Setup and handover

    Scenes, schedules and the app, with a walkthrough for the family.

Garden Villa at night with warm facade lighting

From our portfolio

Garden Villa

Wi-Fi with no dead zones on three floors and outside, 11 perimeter cameras and about 20 outdoor lighting groups on schedules, all on one Home Assistant server. Our KAP Villa project on KNX is in progress now.

see all projects